York Mills Centre
The campus is a 549,000-square-foot, four-building office complex that features raised floors throughout, two internal bus stations, and is directly above the York Mills Subway Station. Including parking and the purpose built bus terminals, the complex is approximately 1.5 million square feet.
History
Building 1, built in 1986, is a 5 floor building with 91,262 sq ft (8,478.5 m) space. This Phase I building was leased to Suncor in 1987, and it remains their corporate headquarters. Building 2, built in 1986 is a 5 floor building with 133,585 sq ft (12,410.5 m) of space. Building 3, built in 1989, is a 7 floor building with 195,256 sq ft (18,139.9 m). of space. Building 4, built in 1990, is a 4 floor building with 119,040 sq ft (11,059 m). of space.
References
- ^ "Manulife Real Estate acquires three prime real estate assets in key North American markets". Manulife Financial. December 20, 2011. Archived from the original on May 15, 2012.