Zhongshan Park Station (Foshan Metro)
Station theme
This station is one of the featured stations of the rear section of Line 3, with the theme of Cantonese opera and the design elements of the Ancestral Temple Qionghua Hall to showcase the history and culture of Foshan.
History
When Line 3 was approved in 2012, this station was not included. In 2015, the planning of Line 3 was changed, and this station was added to the line. In the end, the construction of this station was implemented. The site began enclosure construction on August 9, 2017. On July 23, 2020, the back cover of the main structure was completed. On October 17, 2020, the main structure of the site was capped.
In addition, the station also has a transfer node and a reserved island platform structure. The reserved part was originally planned to be used by Line 7, but since the current plan of Line 7 has been changed to pass through Foshan Railway Station, and no longer has a stop at this station, it is still unknown whether the reserved part can be used again in the future.
Station layout
The station has an island platform under Wenchang Road.
G | - | Exits B-D |
L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
L2 Platforms |
Platform 1 | 3 termination platform |
Island platform, doors will open on the left | ||
Platform 2 | 3 towards Shunde College Railway Station (Diejiao) | |
L3 Reserved Platforms |
Reserved track area | |
Reserved Island platform | ||
Reserved track area |
Exits
There are 3 entrances/exits, lettered B-D, which are located on the north and south sides of Wenchang Road.
Exit letter | Exit location | |
---|---|---|
B | Wenchang Road, Zhongshan Park | |
C | Huozhan Road, Wenchang Road, Chengfa · Denghu Yueyuan | |
D | West Wenchang Road, Zhongshan Park |
Gallery
-
Concourse featuring station theme
-
Exit B
-
Exit C
-
Exit D
Notes
- ^ Prior to opening, it was known as part of the 'rear section' or 'section under construction'
References
- ^ 梁焯贤 (2019-12-28). "佛山地铁3号线、2号线一期站点详细位置公布!最新进展" [The detailed locations of Foshan Metro Line 3 and Line 2 Phase 1 stations have been announced! Latest progress]. Foshan News Network (in Simplified Chinese). Archived from the original on 2022-06-26. Retrieved 2024-08-21 – via Foshan Municipal People's Government.
- ^ 刘佳伦 (2024-08-23). "佛山3号线开通首日,人气如何?南方+记者带你现场直击" [How popular is Foshan Line 3 on its first day of operation? Nanfang+ reporter takes you to the scene]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-08-23. Retrieved 2024-08-24.
- ^ 李传智 (2024-08-20). "官宣!佛山地铁3号线在建段将于本周五开通" [Official announcement! The under-construction section of Foshan Metro Line 3 will open this Friday]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-08-20. Retrieved 2024-08-21.
- ^ 李传智 (2024-08-05). "禅城城北将迈入地铁时代,"样板级"地铁站将加速佛山文商旅融合" [The northern part of Chancheng will enter the subway era, and the "model" subway station will accelerate the integration of culture, commerce and tourism in Foshan]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-08-07. Retrieved 2024-08-21.
- ^ 李传智 (2013-06-07). "地铁三号线工程环评第二次公告发布:三号线将与7条地铁线换乘" [The second environmental impact assessment announcement for Metro Line 3 was released: Line 3 will transfer with 7 metro lines]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2022-07-25. Retrieved 2024-08-21 – via Sina Corporation.
- ^ 李传智; 何超 (2015-07-22). "最长地铁线串起14条轨道线" [The longest subway line connects 14 rail lines]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2022-07-29. Retrieved 2024-08-21 – via Foshan Municipal People's Government.
- ^ 周文琪 (2017-08-04). "8月9日起,地铁3号线中山公园站、镇安站施工!" [Starting from August 9, construction will begin on Zhongshan Park Station and Zhen'an Station of Metro Line 3!]. Foshan Daily (in Simplified Chinese). Archived from the original on 2021-07-24. Retrieved 2024-08-21.
- ^ "力排万难!佛山地铁三号线中山公园站全面封底" [Overcoming all difficulties! Zhongshan Park Station on Foshan Metro Line 3 is fully closed]. China Construction Fourth Engineering Bureau Civil Engineering Co., Ltd. (in Simplified Chinese). 2020-07-27. Archived from the original on 2022-07-30. Retrieved 2024-08-21 – via Official WeChat Account.
- ^ "三年,这座车站终于封顶大吉!" [After three years, the station was finally completed!]. China Construction Fourth Engineering Bureau Civil Engineering Co., Ltd. (in Simplified Chinese). 2020-10-18. Archived from the original on 2022-07-30. Retrieved 2024-08-21 – via Official WeChat Account.
- ^ "中山公园站为地铁3号线、7号线换乘站" [Zhongshan Park Station is a transfer station for Metro Line 3 and Line 7]. Zhujiang Times (in Simplified Chinese). 2017-02-09. Archived from the original on 2022-07-31. Retrieved 2024-08-21 – via Foshan Online.
- ^ "佛山地铁三号线有新进展,多个站点效果图曝光" [Foshan Metro Line 3 has new progress, and renderings of multiple stations have been exposed]. Foshan News Network (in Simplified Chinese). 2019-09-23. Archived from the original on 2022-07-30. Retrieved 2024-08-24 – via Official WeChat Account.
- ^ "定了!佛山地铁3号线在建段8月23日开通运营,票价公布→" [It's settled! The under-construction section of Foshan Metro Line 3 will open on August 23, and the ticket prices will be announced →]. Zhujiang Times (in Simplified Chinese). 2024-08-20. Archived from the original on 2024-08-20. Retrieved 2024-08-21 – via Official NetEase account.
- ^ "中山公园". Foshan Metro (in Simplified Chinese). Foshan Metro.
External links
- Station information: 中山公园