The Andijan Dam is a buttress dam on the river Kara Darya near Andijan in Andijan Region, Uzbekistan. Its reservoir, known as the Andijan Reservoir in Uzbekistan and Kempir-Abad Reservoir in Kyrgyzstan, covers 56 km (22 sq mi) and stretches into the neighboring Osh Region of Kyrgyzstan.

The dam serves several purposes including irrigation in the Fergana Valley and hydroelectric power production. Water released from the dam can enter a canal on either side of the river downstream. The dam has two power stations located at its base, Andijan 1 and Andijan 2. The former contains four 35 MW turbine-generators and the latter contains two 25 MW Francis turbine-generators for a total installed capacity of 190 MW.

Construction on the dam began in 1969 and the generators at Andijan 1 were commissioned between 1974 and 1984. Construction at Andijan 2 began in 2007 and it was commissioned on 2 September 2010. It cost US$28.5 million of which US$15.93 million was provided by the Exim Bank of China.

The artificial lake created by this dam, the Andijan Reservoir, is fed by the Kara Darya and its tributaries Kurshab and Jazy.

References

  1. ^ "Building of Small HPP-2 at Andijan water basin" (PDF). United Nations CDM. 3 February 2010. Retrieved 24 January 2017.
  2. ^ "Uzbekistan commissions Andijan station". Trend. 2 September 2010. Archived from the original on 8 December 2015. Retrieved 17 January 2015.