Cultural Park Station
Cultural Park station (simplified Chinese: 文化公园站; traditional Chinese: 文化公園站; pinyin: Wénhuà Gōngyuán Zhàn) is an interchange station between Line 6 and Line 8 of the Guangzhou Metro. It is located underground in the Liwan District and started operation on 28 December 2013.
Station layout
G | - | Exits A, B, D, E |
L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities, Toilets |
L2 Equipment Area |
- | Station equipment |
L3 Line 6 Platforms |
Reserved Zone | Reserved for Line 8 |
Platform 2 | 6 towards Xunfenggang (Huangsha) | |
Island platform, doors will open on the left | ||
Platform 1 | 6 towards Xiangxue (Yide Lu) | |
L4 Line 8 Platforms |
Platform 3 | 8 towards Jiaoxin (Hualinsi Buddhist Temple) |
Side platform, doors will open on the left | ||
Pedestrian Passageway | Passage linking Line 8 platforms | |
Side platform, doors will open on the left | ||
Platform 4 | 8 towards Wanshengwei (Tongfuxi) |
Exits
Exit number | Exit location | |
---|---|---|
Exit A | Xidi Ermalu | |
Exit B | Xidi Ermalu | |
Exit D | Zhen'an Lu | |
Exit E | Liu'ersan Lu |
Gallery
-
West concourse (Line 6)
-
South concourse (Line 8)
-
Platform 4 (Line 8 towards Wanshengwei)
-
Line 6 platform wall decoration
-
Culture wall
-
Exit A
-
Exit B
References
- ^ Zheng, Xiaojia. "Guangzhou Metro Line 6 Scheduled to Open on Dec. 28". Life of Guangzhou. Guangzhou Interactive Information Network. Archived from the original on 27 January 2021. Retrieved 10 January 2014.