Loading
  • 21 Aug, 2019

  • By, Wikipedia

Dortmund Hbf

Dortmund Hauptbahnhof is the main railway station in Dortmund, North Rhine-Westphalia, Germany. The station's origins lie in a joint station of the Köln-Mindener Eisenbahn and Bergisch-Märkische Eisenbahn which was built north of the city centre in 1847. That station was replaced by a new station, erected in 1910 at the current site. It featured raised embankments to allow a better flow of traffic. At the time of its opening, it was one of the largest stations in Germany. It was, however, destroyed in an Allied air raid on 6 October 1944.

The main station hall was rebuilt in the year 1952 in a contemporary style. Its stained glass windows feature then-common professions of Dortmund.

The station has 190,000 passengers passing through each day.

History

The original Dortmund station was built north of the city centre by the Cologne-Minden Railway Company (Cöln-Mindener Eisenbahn-Gesellschaft, CME) as part of its trunk line and opened on 15 May 1847. Two years later the Bergisch-Märkische Railway Company (Bergisch-Märkische Eisenbahn-Gesellschaft, BME) opened its station as a purely terminating station south of the existing station at the end of its main line to Elberfeld (now Wuppertal), its line to Soest (from 1855) and its Ruhr route to Duisburg and Oberhausen (from 1860). The original station building on an island, with access from the castle gate, was replaced in 1910 by a spacious new building at the current location. The tracks were raised to end the obstacle to road traffic through restricted level crossings. This second Dortmund station was inaugurated on 12 December 1910 and was one of the largest in the German Empire when it opened. The station then received the name "Dortmund Hbf" on 1 October 1912. It was destroyed during the Second World War.

The entrance building of Dortmund Hauptbahnhof was replaced in 1952 by a functionalist building. It is regarded as architecturally insignificant, but it has significant stained glass windows on the theme of the former industrial specialisations of Dortmund. Five large stained glass windows document the Dortmund economy. In the middle one the city is shown, flanked to the left and right by a steelworker, a blast furnace worker, a brewer and a bridge builder. During the reconstruction of the station they were removed and the put on exhibition at the Hattingen Henrichshütte (a former steel works, which is partly used as a museum of industry). They were replaced with exact copies.

Reconstruction and rehabilitation

Dortmund Hauptbahnhof
Dortmund Hauptbahnhof from the RWE Tower
Thalys, Dortmund-Paris-North

The reconstruction of the Dortmund Hauptbahnhof has been under discussion since 1997. The original plan for a residential area in the form of an "oversized UFO" (80,000 square metres (860,000 sq ft) of usable space) was rejected. On 7 October 1998 a memorandum of understanding had been signed between Deutsche Bahn, the state of North Rhine-Westphalia and Westdeutsche Immobilien Bank. The Deutsche Mark (DM) 850 million project was to be completed by 2002.

After the plans for the so-called "Dortmund UFO" were dropped, a new investor was found in 2001 in the form of the Portuguese investment group Sonae Imobiliaria. The DM 1.2 billion project was to be completed by 2006 and new designs were commissioned from architectural firms in the first quarter of 2001. The new proposed development was called "3do" (3 Dortmund). €75 million of federal and €55 million of state funds were pledged. It was planned to have 36,000 square metres (390,000 sq ft) of retail and 26,500 square metres (285,000 sq ft) of entertainment space. On 3 February 2006, the Essen branch of the Federal Railway Authority (Eisenbahn-Bundesamt) approved the plans for "3do". On 28 February 2007, Deutsche Bahn announced that the investor was unwilling to commit to the project.

Through plans for the reconstruction of the station have twice failed, Dortmund Hauptbahnhof suffers significantly from neglect. Only the terminating platforms (tracks 2–5) and the platform of S-Bahn lines S1 and S2 (tracks 6 and 7) have a lift.

The reconstruction and rehabilitation of the Dortmund Hauptbahnhof began in summer 2009. In a first phase, the station building and related operational areas were gutted. During construction the ticket office and a restaurant of a fast-food chain were placed in containers outside the station. The federal police station and the Bahnhofsmission (a German charity focussed on railway stations) were also placed in containers on the north side. On 17 June 2011, the first phase was formally completed. Of the total cost of €23 million, the federal government contributed €13.3 million, the state €1.4 million and the Deutsche Bahn €8.3 million.

In a second phase, which is scheduled to be completed until 2024, the station tunnels and the entrances to the platforms will be renewed. Dortmund is one of the few big-city stations in Germany where access to the platforms has not yet made accessible for the disabled. In the course of these alterations the eastern access to the tunnel linking the station's buildings and platforms will also be rebuilt. At the same time it is also intended that there will be improvements to facilitate the introduction of the Rhine-Ruhr Express (a planned upgrade to North Rhine-Westphalia's Regional-Express network).

Services

Long distance

Dortmund Hauptbahnhof is served by Thalys, Flixtrain, Deutsche Bahn Intercity-Express and Intercity services.

Line Route Frequency Operator
ICE 10 Berlin OstbahnhofHanoverBielefeldHammDortmundEssenDuisburgDüsseldorf (– Cologne) Hourly DB Fernverkehr
ICE 14 Berlin – Stendal – Hanover – Herford – Bielefeld – Gütersloh – Hamm – DortmundBochum – Essen – Duisburg – Düsseldorf Some services
IC 32 Dortmund – Essen – Duisburg – Düsseldorf – Cologne – BonnKoblenzMainzMannheimHeidelbergStuttgartUlmMemmingenKemptenOberstdorf 1 train pair
IC 34 (Münster – Hamm –) DortmundWittenHagen – Iserlohn-Letmathe – FinnentropSiegenFrankfurt 120 min (60 mins for IC 34 and RE 34 together)
ICE 41 Dortmund – Essen – Duisburg – Düsseldorf – Köln Messe/Deutz – Frankfurt Airport FrankfurtAschaffenburgWürzburg – Nuremberg – Munich Some services
Munich – Nuremberg – Würzburg – FuldaKassel-WilhelmshöhePaderborn – Hamm – Dortmund – Essen – Duisburg – Düsseldorf (– Cologne / Köln Messe/Deutz – Wiesbaden – Frankfurt) 1 train pair
ICE 42 (Hamburg - Münster –) Dortmund – Essen – Duisburg – Düsseldorf – Cologne – Siegburg/BonnFrankfurt Airport – Mannheim – Stuttgart – Ulm – AugsburgMünchen-Pasing – Munich Every 2 hours
ICE 43 Hamburg-AltonaHamburgBremenOsnabrück – Münster – Dortmund – Bochum – Essen – Duisburg – Düsseldorf – Cologne – Frankfurt Airport – Mannheim – KarlsruheFreiburgBasel Some services
ICE 47 Dortmund – Essen – Duisburg – Düsseldorf – Köln Messe/Deutz – (Cologne/Bonn Airport –) Frankfurt Airport – Mannheim – Stuttgart Some services
ICE 49 DortmundHagenWuppertalSolingen – Cologne – Cologne/Bonn Airport – Siegburg/Bonn – MontabaurLimburg Süd Frankfurt Airport – Frankfurt 2 train pairs
IC 51 Gera – Jena – WeimarErfurt – Eisenach – Kassel – Dortmund – Essen – Duisburg – Düsseldorf (– Cologne) 2 train pairs
IC 55 DresdenLeipzigHalleMagdeburgBraunschweig – Hanover – Bielefeld – Hamm – Dortmund – Hagen – Wuppertal – Solingen – Cologne – Bonn – Koblenz – Mainz – Mannheim – Heidelberg – Stuttgart (– Tübingen) Every 2 hours
ICE 91 Dortmund – (Bochum – Essen – Duisburg – Düsseldorf) / (Hagen – Wuppertal – Solingen) – Cologne – Bonn – Koblenz – Mainz – Frankfurt Airport – Frankfurt – Hanau – Würzburg – Nuremberg – RegensburgPlattlingPassauWelsLinzSt. Pölten Wien Meidling WienVienna Airport Some services
Eurostar Dortmund – Essen – Duisburg – (Düsseldorf Airport –) Düsseldorf – Cologne – Aachen – Liège-GuilleminsBrusselsParis Some services Eurostar
FLX 30 Berlin Südkreuz – Berlin Hbf – Berlin-SpandauHannoverBielefeldDortmundEssenDuisburgDüsseldorfCologne (– Aachen) 1-2 train pairs daily Flixtrain

Regional services

In local passenger service, Dortmund is served by several regional and S-Bahn lines (as of 2020):

Line Route Frequency
RE 1
NRW-Express
AachenEschweilerDürenHorremCologneDüsseldorfDüsseldorf AirportDuisburgMülheimEssenBochumDortmundHamm 60 min
RE 3
Rhein-Emscher-Express
Düsseldorf – Duisburg – Oberhausen – Essen-Altenessen – GelsenkirchenWanne-EickelHerne – Castrop-Rauxel – Dortmund – Kamen – Hamm 60 min
RE 4
Wupper-Express
Aachen – Mönchengladbach – Düsseldorf – WuppertalHagenDortmund 60 mins
RE 6
Rhein-Weser-Express
Minden – Herford – Bielefeld – Hamm – Dortmund – Essen – Mülheim – Duisburg – Düsseldorf Airport – Düsseldorf – Neuss – Cologne – Cologne/Bonn Airport 60 min
RE 11
Rhein-Hellweg-Express
Düsseldorf – Düsseldorf Airport – Duisburg – Mülheim – Essen – Dortmund – Hamm – Paderborn (– Kassel-Wilhelmshöhe) 60 min
RB 32
Rhein-Emscher-Bahn
Duisburg – Oberhausen – Essen-Altenessen – Gelsenkirchen – Wanne-Eickel – Castrop-RauxelDortmund 60 min
RE 34
Dortmund-Siegerland Express
DortmundWitten – Iserlohn-Letmathe – FinnentropKreuztalSiegen 120 min (60 mins for IC 34 and RE 34 together)
RB 43
Emschertal-Bahn
DorstenGladbeck - Wanne-Eickel – Herne – Dortmund 60 min
RB 50
Der Lüner
MünsterLünenDortmund 60 min
RB 51
Westmünsterlandbahn
Dortmund – Lünen – DülmenCoesfeldGronauEnschede 60 min
RB 52
Volmetal-Bahn
Lüdenscheid – Lüdenscheid-Brügge – Schalksmühle – Hagen – Dortmund 60 min
RB 53
Ardey-Bahn
Dortmund – Schwerte (Ruhr) – Iserlohn 30–60 min
RE 57
Dortmund-Sauerland-Express
DortmundDortmund-HördeFröndenbergArnsberg – Bestwig (branch 1: – Bigge – Winterberg) / (branch 2: – Brilon WaldBrilon Stadt) 60 min (Dortmund–Bestwig)
120 min (Bestwig–Winterberg/Brilon)
RB 59
Hellweg-Bahn
DortmundHolzwickedeUnnaSoest 20/40 min (weekdays)
60 min (Sundays and public holidays)
S1 Dortmund (1) – Bochum – Essen (2) – Mülheim – Duisburg – Düsseldorf Airport – Düsseldorf (3) – Hilden  – Solingen (4) 15 min (1–2),
30 min (2–3),
20 min (3–4)
S2 Dortmund – Castrop-Rauxel – Herne (– Wanne-Eickel – Gelsenkirchen – Essen) / (– Recklinghausen) 30 min
S5 Dortmund – Witten (– Wetter – Hagen) 30 mins

Light rail

Underground platforms of Dortmund Stadtbahn

The station is served by lines U41, U45, U47 and U49 of the Dortmund Stadtbahn.

∗ U45 becomes at the station Westfalenhallen the line U46 and continues to Brunnenstraße. On match days of the Borussia Dortmund soccer club the line ends instead of the regular terminus Westfalenhallen at the Westfalenstadion station, which is only open on these occasions. In this case it does not continue as U46.

References

  1. ^ "Stationspreisliste 2024" [Station price list 2024] (PDF) (in German). DB Station&Service. 24 April 2023. Retrieved 29 November 2023.
  2. ^ Eisenbahnatlas Deutschland (German railway atlas) (2009/2010 ed.). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.
  3. ^ Airport information for Dortmund Hauptbahnhof at Transport Search website.
  4. ^ "Linie U41". Dortmunder Stadtwerke AG. 1 July 2019. Archived from the original on 31 October 2019. Retrieved 31 October 2019.
  5. ^ "Dortmund-Dorstfeld Hbf operations". NRW Rail Archive (in German). André Joost. Retrieved 29 April 2016.
  6. ^ Dortmund Infrastructure Information auf dortmund.de, accessed 07 December 2023
  7. ^ "Dortmund Hbf train schedules". Trainline International. Retrieved 23 March 2020.
  8. ^ Joost, André. "Hagen–Witten–Dortmund line". NRW Rail Archive (in German). Retrieved 13 May 2020.
  9. ^ Joost, André. "Dortmund–Soest line". NRW Rail Archive (in German). Retrieved 13 May 2020.
  10. ^ Joost, André. "Bochum–Dortmund line". NRW Rail Archive (in German). Retrieved 13 May 2020.
  11. ^ "Alte Bahnhofsfenster wieder neu" (in German). Der Westen. 17 December 2009. Archived from the original on 29 October 2013. Retrieved 20 August 2011.
  12. ^ "Neuer Hauptbahnhof für Dortmund". Eisenbahn-Revue International (in German) (11/1998): 451. ISSN 1421-2811.
  13. ^ "Aktuelles in Kürze". Eisenbahn-Revue International (in German) (3/2001): 106. ISSN 1421-2811.
  14. ^ "Wiedereröffnung Empfangsgebäude Dortmund Hauptbahnhof" (Press release) (in German). DB Mobility Logistics AG. 17 June 2011. Retrieved 20 August 2011.
  15. ^ "Tunnel durch Dortmunder Hauptbahnhof am Wochenende gesperrt - das ist der Grund". ruhr24.de (in German). 23 February 2019. Retrieved 23 February 2020.
  16. ^ "Kaum Neues vom RRX" (in German). Der Westen. November 2009. Archived from the original on 13 November 2009. Retrieved 20 August 2011.
  17. ^ Joost, André. "Dortmund Hauptbahnhof". NRW rail archive (in German). Retrieved 13 May 2020.