Hongshengsha Station
History
Although the route of Line 7 to Huangpu in the early planning stage will pass through Hongshengsha Island, it did not set up a station on the island until 2016. Eventually, the station was included in the second phase of Line 7 for construction. Construction started on 18 April 2019, the construction of the main envelope structure was completed in April 2020. In May 2021, the main structure of the station was successfully capped, making it the first station to be topped out in the second phase of Line 7.
The station was handed over to the '3 Powers' on 31 October 2023 for territorial management and operation of the station and facilities.
Station information
Since both ends of the station are on the Pearl River, and in order to meet the requirements of the depth of the rail crossing the river, the station has a total of 3 floors. The station is planned to have 4 exits.
G | Street level | Exits A-D |
L1 Concourse |
Lobby | Customer Service, Shops, Vending Machines, ATMs |
L2 Mezzanine |
Buffer Level | Station Equipment |
L3 Platforms |
Platform 2 | ![]() |
Island platform, doors will not open (trains do not stop here) | ||
Platform 1 | 7 towards Yanshan (Yufengwei) ![]() |