Loading
  • 21 Aug, 2019

  • By, Wikipedia

Manjunathanagara Metro Station

Manjunatha Nagar is an upcoming elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. Around this metro station holds the main Bengaluru-Nelamangala Expressway (NH-75) leading towards the city of Nelamangala in Karnataka.

As per latest updates, the Madavara - Nagasandra stretch trial run was conducted on August 6 2024 and with successful trial run, this metro station is slated to be operational around mid-month of October 2024.

Station layout

Station Layout (TBC)

Manjunath Nagar track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute
Next Station: Nagasandra
Platform 1
Northbound
Towards ← Madavara
Next Station: Chikkabidarakallu
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

See also

References

  1. ^ Bureau, The Hindu (5 October 2024). "Bengaluru Metro's Green Line extension set to open this month". The Hindu. ISSN 0971-751X. Retrieved 7 October 2024. {{cite news}}: |last= has generic name (help)
  2. ^ Sridhar Vivan (5 August 2024). "Green line trial runs kick off in August". Bangalore Mirror. Retrieved 7 August 2024.
  3. ^ Ghoshal, Sudeshna (6 August 2024). "Bengaluru metro update: New trains on Green line for THESE stations in Bangalore; trial run today". Mint. Retrieved 7 August 2024.