Loading
  • 21 Aug, 2019

  • By, Wikipedia

Taki Dam

Taki Dam (滝ダム) is a gravity dam on the Tadami River, 7.3 km (5 mi) east of Tadami in Fukushima Prefecture, Japan. Surveys for the dam were carried out in 1958, construction began in 1959 and the dam was complete in 1961. The primary purpose of the dam is hydroelectric power generation and it supports a 92 MW power station consisting of 2 x 46 MW Kaplan turbines. The dam is 46 m (151 ft) tall and 264 m (866 ft) long. It creates a reservoir with a 27,000,000 m (21,889 acre⋅ft) capacity, of which 10,300,000 m (8,350 acre⋅ft) is active (or "useful") for power generation. The dam's spillway is controlled by four sluice gates and has a 200 m/s (7,063 cu ft/s) discharge capacity.

See also

References

  1. ^ "Falls Power Station Power Development" (in Japanese). Suiryoku. Retrieved 16 August 2011.
  2. ^ "Case Study 15-02: Others – Use of Driftwood in Reservoir – Taki Dam, Japan" (PDF). IEA Hydropower Implementing Agreement Annex VIII -. New Energy Foundation. 2006. Archived from the original (PDF) on 3 October 2011. Retrieved 15 August 2011.