Wiesbaden Hbf
History
The current station replaced three stations in the city centre, which were next to each other near the fairground (Rhein-Main-Hallen) and the Wiesbaden Museum. These were:
- The Taunusbahnhof (Taunus station), built in 1840 for the Taunus Railway (Wiesbaden–Castel–Höchst–Frankfurt (Taunusbahnhof).
- The Rheinbahnhof (Rhine station), built in 1857 for the East Rhine railway (Wiesbaden–Biebrich–Rüdesheim–Niederlahnstein).
- The Ludwigsbahnhof (Ludwig's Railway station), built in 1879 for the Ländches Railway (Wiesbaden-Niedernhausen).
A fourth railway line was added in 1889, connecting to the Rheinbahnhof, with the opening Langenschwalbach Railway (now the Aar Valley Railway—Aartalbahn) from the Rheinbahnhof in Wiesbaden to Bad Schwalbach (then called Langenschwalbach) and later extended to Diez on the Lahn.
The new station building became necessary to handle the growing number of passenger visiting the spa city at that time. It was built from 1904 to 1906 according to the plans of Fritz Klingholz in a flamboyant neo-baroque style that corresponded to an international style of architecture adopted for spa towns. It was also intended to welcome Kaiser Wilhelm II on his visit to the spa every May and a platform was established for him and other aristocrats. The first train ran into the new station on 15 November 1906 around 2:23 a.m. In the station building the relics of the former images of crowned heads, with the faces removed, can still be seen in many places.
The new Hauptbahnhof was located outside the town at the time of its building at the south-eastern end of the then newly constructed ring road (the Kaiser-Friedrich-Ring and the Bismarckring), which runs in an arc to the west of the historic pentagon (Historische Fünfeck) at the centre of Wiesbaden. During the period up to the First World War the town developed towards the new station.
On 25 September 1983, the Hauptbahnhof was affected by the closure of a line. Passenger services were discontinued between Wiesbaden and Bad Schwalbach on the Aar Valley Railway. One of the long-term consequences was the decommissioning and dismantling of station track 11 so that the station now has only 10 tracks.
Wiesbaden Hauptbahnhof was extensively refurbished and modernised at a cost of €25 million between 2003 and 2004. A redesign of the forecourt, costing €1.5 million, was carried out between mid-2006 and March 2007. The modernisation should have been completed with the opening of the high-speed line to Cologne, but was postponed several times due to lack of funds.
Next door is the Lilien-Carré shopping centre opened in March 2007 on the site of the former main post office.
As part of the economic stimulus package, the train shed roofs have been renovated at a cost of €35 million since late 2010.
Connection to the Cologne-Frankfurt high-speed line
Wiesbaden Hauptbahnhof is connected to the Cologne-Frankfurt high-speed line by the approximately 13.0 km long Breckenheim–Wiesbaden line opened in 2002.
This line had been subjected to extensive analysis and discussions by 1990. Three options were investigated:
- an alignment of the main route of the high-speed line through Wiesbaden station. This option was originally premised on the route of the line running generally along the eastern bank of the Rhine, which was rejected after exhaustive investigations. It examined possible connection to the current station:
- by continuing to serve the terminal station,
- with the construction of a new underground station deep near the existing station area, running north–south, and
- with the construction of a new underground station, running east–west;
- an alignment on the eastern outskirts of Wiesbaden, with sub-variants with or without the construction of a new station. Possible station sites were tested in the Hainerberg district (more than a kilometre east of the Hauptbahnhof), near Wiesbaden Ost station and east of the Bierstadt district. Only in the case of Wiesbaden Ost was a link to the S-Bahn possible and in all three cases connections to public transport (especially buses) would have had to be changed.
- an alignment along the A3 to the east of Wiesbaden.
The option of running under the Wiesbaden city area with a station on a north–south orientation was dismissed. Overall, this option required an ascending 10.2 km tunnel. Also rejected was the east–west option as it would have required a tunnel that was located 30 to 100 m below the water table. The high pressure of ground water under parts of the city of Wiesbaden made this extremely difficult. Test bores on the route of the postulated tunnel found material that was penetrated by debris.
In August 1991, the state of Hesse, the city of Wiesbaden and the Deutsche Bundesbahn agreed to a ground-level connection running from the Hauptbahnhof via a link to the east to the new line. The realised Wiesbadener Kreuz (Wiesbaden Cross) option was accessed as having the best cost-benefit ratio. A major argument put forward in the assessment report was that the best way by far of generating passenger traffic would be a connection to the existing station and that only at Wiesbaden Hauptbahnhof would it be possible to give comprehensive access to public transport. Furthermore, the option largely agreed with the route promoted by nature conservation and environmental groups.
A proposed branch off the link along the A 66 and connecting to the high-speed line towards Frankfurt, which would be served only by regional services has not been realized. As part of the connection to the new line, a platform in Wiesbaden station was extended to the length of long ICE trains. The cost of €1.7 million were funded by the federal government.
Patronage of services on the line have been disappointing and services have been cut back from those originally operating so that there are now only two services each way on week days only.
Architecture
The station building is connected to a five-span train-shed, originally with eleven tracks (now only ten are in operation), which are located in front of a broad vaulted concourse that extends eastward beyond the train-shed and at right angles to it to a vaulted lobby to the east of platform track 1.
The exterior is formed of red sandstone and has rich Baroque Revival forms. The highlight is the lobby on the eastern side, which has a 40-metre-high (130 ft) clock tower with a curved canopy. The former entrance on the western side is surmounted by a copper dome. The roof is adorned with green tiles.
The interior of the building is formed of yellow sandstone, in contrast to the exterior. The roof over the actual platform area consists of steel and glass.
During its renovation in 2004, the station was largely restored to its original appearance. The monumental nature of the concourse is now restored to its full advantage as distracting objects have been removed.
Rail services
It is served by the following long-distance services:
Line | Route | Frequency |
---|---|---|
ICE 11 | Wiesbaden – Mainz – Worms – Mannheim – Stuttgart – Ulm – Augsburg – Munich | One train |
ICE 20 | Wiesbaden – Mainz – Frankfurt – Kassel-Wilhelmshöhe – Göttingen - Hannover – Hamburg-Altona | One train |
ICE 25 | Hamburg-Altona – Hamburg – Hannover – Göttingen – Kassel-Wilhelmshöhe – Frankfurt Hbf – Frankfurt Airport – Mainz Hbf – Wiesbaden Hbf | One train |
ICE 41 | Munich – Nuremberg – Würzburg – Fulda – Kassel-Wilhelmshöhe – Hamm – Dortmund – Duisburg – Düsseldorf – Köln Messe/Deutz – Wiesbaden Hbf – Frankfurt Airport – Frankfurt (Main) Hbf | One train (Mon–Fri) |
ICE 42 | Wiesbaden – Mainz – Worms – Mannheim – Stuttgart – Ulm – Augsburg – Munich | One train |
ICE 45 | Stuttgart – Vaihingen (Enz) – Heidelberg – Mannheim – Mainz – Wiesbaden – Limburg Süd – Montabaur – Siegburg/Bonn – (Cologne/Bonn Airport –) Cologne | One pair |
ICE 45 | Mainz – Wiesbaden – Limburg Süd – Montabaur – Cologne | One train (Mon–Fri) |
ICE 50 | Wiesbaden – Mainz – Frankfurt Airport – Frankfurt – Fulda – Eisenach – Erfurt – Leipzig – Dresden | Every 2 hours |
Regional trains
The station is served by the following regional services:
Line | Route | Frequency |
---|---|---|
RB 10 | RheingauLinie Neuwied – Koblenz Stadtmitte – Koblenz – Rüdesheim (Rhein) – Wiesbaden – Frankfurt |
Hourly (extra peak hour services) |
RB 21 | Ländchesbahn (Limburg (Lahn) – Bad Camberg –) Niedernhausen – Wiesbaden-Igstadt – Wiesbaden |
Half hourly (hourly in evening and on weekends) |
RB 33 | Nahetalbahn Wiesbaden Hbf – (Mainz Hbf –) Ingelheim – Bad Kreuznach (– Idar-Oberstein) |
Individual services |
RB 75 | Rhein-Main-Bahn Wiesbaden – Mainz – Bischofsheim – Groß Gerau – Weiterstadt – Darmstadt – Dieburg – Babenhausen – Aschaffenburg |
Half hourly (hourly in evening and on weekends) |
S-Bahn
The station is the terminus of three lines of the Rhine-Main S-Bahn:
Line | Route | Frequency |
---|---|---|
Wiesbaden – Mainz-Kastel – Hattersheim (Main) – Frankfurt-Höchst – Frankfurt Hbf (underground) – Offenbach Ost – Rödermark - Ober-Roden | Half hourly | |
Wiesbaden – Mainz – Bischofsheim – Rüsselsheim – Frankfurt Airport – Frankfurt Hbf (underground) – Offenbach Ost (– Mühlheim (Main) – Hanau) | Half hourly | |
Wiesbaden – Mainz-Kastel – Bischofsheim – Rüsselsheim – Frankfurt Airport – Frankfurt Hbf (underground) – Offenbach (Main) Ost – Mühlheim (Main) – Hanau Hbf | Half hourly |
See also
References
- ^ "Stationspreisliste 2025" [Station price list 2025] (PDF) (in German). DB Station&Service. 28 November 2024. Retrieved 5 December 2024.
- ^ "Tarifinformationen 2021" (PDF). Rhein-Main-Verkehrsverbund. 1 January 2021. p. 153. Retrieved 8 April 2021.
- ^ "RNN Wabenplan 2021" (PDF). Rhein-Nahe-Nahverkehrsverbund . 1 January 2021. Retrieved 8 April 2021.
- ^ "In neuem Glanz" (in German). www.mobil.de. Retrieved 11 October 2013.
- ^ "Wiesbadens neuer Bahnhofsvorplatz ist fertig gestellt" (Press release) (in German). Deutsche Bahn. 26 March 2007.
- ^ "Umbau des Wiesbadener Hauptbahnhofs verschoben". Eisenbahn-Kurier (in German) (345): 9. June 2001. ISSN 0170-5288.
- ^ "Deutsche Bahn saniert für 35 Millionen Euro Hallendächer des Wiesbadener Hauptbahnhofes" (Press release) (in German). DB Mobility Logistics AG. 22 November 2010.
- ^ Walter Engels, Wilfried Zieße (1991). "Die Neubaustrecke Köln–Rhein/Main - eine Zwischenbilanz". Die Bundesbahn (in German) (10). Darmstadt: 965–975. ISSN 0007-5876.
- ^ "Bahn soll 1,7 Millionen Euro zurückzahlen". Wiesbadener Tagblatt (in German). 7 November 2008.
External links
- Cornelius (1908). "Das neue Empfangsgebäude auf dem Hauptbahnhof Wiesbaden" (PDF). Zeitschrift für Bauwesen (in German). Retrieved 19 May 2012.
- "Track plan of Wiesbaden Hbf" (PDF; 200,1 KB) (in German). Deutsche Bahn. Retrieved 19 May 2012.
- "Photos from the first 100 years of the station" (in German). noack-immobilien.de. Retrieved 19 May 2012.
- "Photos from the reconstruction of the station forecourt" (in German). noack-immobilien.de. Retrieved 19 May 2012.
- "100 Jahre Hauptbahnhof" (in German). Thorsten Reiss Verlag. Retrieved 19 May 2012.