Greenway CSP Mersin Solar Tower
Greenway invested 50 million dollars in the project, which was supported by the Scientific and Technological Research Council of Turkey (TÜBİTAK) and the Technology Development Foundation of Turkey (TTGV). After extensive research and development, the Greenway CSP Mersin Solar Plant began operation in March 2013. The power plant consists of 510 heliostats and has a capacity of 5 MWth. The complete heliostat field is Greenway's own proprietary design, with many innovative features like wireless heliostat field communication, precise solar position calculation, automated heliostat tracking correction, accurate reflection angle calculation, and positioning of heliostats autonomously in dual axis for optimum exposure to solar rays. In addition the Greenway heliostat design allows high reflecting efficiency and reduced manufacturing and assembly costs.
The solar tower plant is situated in the Toroslar district in the northern outskirts of Mersin city, south of the Adana-Erdemli O51 motorway, and is the first concentrated solar power tower in Turkey. Most solar power in Turkey is rooftop solar thermal collector and photovoltaic.
References
- ^ "Projects". Greenway CSP Solar Tower. Retrieved 2014-12-05.
- ^ Llamas, David (2013-04-21). "Turkey's first concentrated solar power built in southern city". HELIOSCSP.
- ^ Erdil, Merve (2013-04-17). "lk yerli güneş kulesi". Hürriyet (in Turkish). Retrieved 2014-12-06.