Lianhe Station
History
The station was called Guidan Road during the planning and construction phase, and in 2022 it was named Lianhe. The station began to enclose the construction of Guidan Road on August 9, 2017, excavated the foundation pit on November 25, 2018, and the main structure was capped on June 23, 2020.
Station layout
The station has an island platform under Lianhe Boulevard. There is a group of double storage lines at the south end of the station, and because the operation of Line 3 is divided into two sections, the trains from Foshan University station will turn back through the storage line, and this station will be the southern terminus of the northern section.
G | - | Exits A-D |
L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
L2 Platforms |
Platform 1 | 3 towards Foshan University (Xiaode Dong) |
Island platform, doors will open on the left | ||
Platform 2 | 3 termination platform |
Exits
The station will have a total of 4 entrances/exits, lettered A-D, which are located on the east and west sides of Lianhe Boulevard. In its initial opening, the station opened Exits A-C.
Exit letter | Exit location | |
---|---|---|
A | Guidan Road | |
B | Guidan Road | |
C | Guidan Road, Lianhe Boulevard, Luocun No.1 High School |
Gallery
-
Concourse
-
Exit A
-
Exit B
Notes
- ^ Prior to opening, it was known as part of the 'rear section' or 'section under construction'
References
- ^ 梁焯贤 (2019-12-28). "佛山地铁3号线、2号线一期站点详细位置公布!最新进展" [The detailed locations of Foshan Metro Line 3 and Line 2 Phase 1 stations have been announced! Latest progress]. Foshan News Network (in Simplified Chinese). Archived from the original on 2022-06-26. Retrieved 2024-08-21 – via Foshan Municipal People's Government.
- ^ 刘佳伦 (2024-08-23). "佛山3号线开通首日,人气如何?南方+记者带你现场直击" [How popular is Foshan Line 3 on its first day of operation? Nanfang+ reporter takes you to the scene]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-08-23. Retrieved 2024-08-24.
- ^ 李传智 (2024-08-20). "官宣!佛山地铁3号线在建段将于本周五开通" [Official announcement! The under-construction section of Foshan Metro Line 3 will open this Friday]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-08-20. Retrieved 2024-08-21.
- ^ "多个重大节点实现突破!佛山地铁三号线工程建设再提速" [Breakthroughs achieved at multiple major nodes! Construction of Foshan Metro Line 3 accelerates again]. Foshan Rail Transit Bureau (in Simplified Chinese). 2020-07-01. Archived from the original on 2022-07-29. Retrieved 2024-08-21.
- ^ 李晔至 (2017-08-08). "明起桂丹路这个路段全封闭施工!地铁三号线桂丹站施工" [Starting tomorrow, this section of Guidan Road will be completely closed for construction! Metro Line 3 Guidan Station construction]. Foshan Daily (in Simplified Chinese). Archived from the original on 2022-07-30. Retrieved 2024-08-21.
- ^ "佛山地铁三号线工程桂丹路站基坑开挖" [Foshan Metro Line 3 Guidan Road Station foundation pit excavation]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 2018-11-27. Archived from the original on 2024-08-21. Retrieved 2024-08-21.
- ^ "定了!佛山地铁3号线在建段8月23日开通运营,票价公布→" [It's settled! The under-construction section of Foshan Metro Line 3 will open on August 23, and the ticket prices will be announced →]. Zhujiang Times (in Simplified Chinese). 2024-08-20. Archived from the original on 2024-08-20. Retrieved 2024-08-21 – via Official NetEase account.
- ^ "联和". Foshan Metro (in Simplified Chinese). Foshan Metro.
External links
- Station information: 联和